Calculation Model of Soil Dam Wash-Away Due to Overflow

https://doi.org/10.21122/2227-1031-2018-17-4-292-296

Abstract

Water flow over soil dam crest causes its fast failure. Break-through wave being formed in dam ebb side leads to drastic economic and social consequences. Accuracy in calculation of the break-through wave parameters depends on the accuracy of discharge hydrograph construction in the dam erosion site. A calculation scheme for soil dam wash-away due to overflow has been devised on the basis of the experimental data. Wash-away process is divided in two stages in accordance with the devised scheme. Wash-away of the downstream toe occurs at the first stage. The crest level from the side of upstream edge remains constant. Intensive crest lowering is observed at the second stage. The eroding body is considered to have a shape of a round-crested weir. In such a case the washed-away massif has a form of nappe-shaped crest profile. A mathematical model has been developed on the basis of this scheme and according to this model equations of deformation and flow motion are considered simultaneously. The model is consistent in a good way with physical erosion pattern during fast flood rise and when the erosion width is known; the model is recommended for calculation of breaching sections in reserve water outlets. In general case and when the width is unlimited (three-dimensional problem) calculation formulae have one more unknown variable that is flow width within the erosion site. The paper describes peculiar features in physiccal erosion pattern for such case and a number of the known formulae for determination of the erosion have been given and analyzed in the paper. The equation which fits in a good way in the proposed mathematical model has been chosen, and it provides the possibility to adapt the model for three-dimensional erosion conditions. Calculations made in accordance with the proposed methodology make it possible to construct discharge hydrograph in the dam erosion site.

About the Author

P. M. Bohaslauchyk
Belаrusian National Technical University
Belarus

Address for correspondence: Bohaslauchyk Petr М. – Belаrusian National Technical University, 150 Nezavisimosty Ave., 220014, Minsk, Republic of Belarus. Tel.: +375 17 267-98-08    fes@bntu.by



References

1. Veksler A. B., Ivashintsov D. A., Stefanishin D. V. (2002) Reliability, Social and Environmental Safety of Hydraulic Structures: Risk Assessment and Decision Making. SaintPetersburg, ALL-Russian Research Institute of Hydrotechnical Engineering named after B. E. Vedeneev. 591 (in Russian).

2. Bogoslavchik P. M. (1990) Hydraulic Calculation of Reserve Water Discharge with Breaching Section. Vodnoye Khozyaistvo i Gidrotekhnicheskoye Stroitelstvo. Respublikanskii Mezhvedomstvennyi Sbornik [Water Industry and Hydrotechnical Construction. Republican Interagency Compilation]. Minsk, Vysheishaya Shkola Publ., 19, 24–30 (in Russian).

3. Bogoslavchik P. M., Filippovich I. V. (1983) For WashAway Calculation of Uniform Sand-Soil Dam in Case of Crest Overflow. Izvestiya Vysshikh Uchebnykh Zavedenii SSSR. Energetika [Proceedings of USSR Higher Education Institutions. Energetika], (2), 100–105 (in Russian).

4. Filippovich I. V., Bogoslavchik P. M. (1986) Investigation of Wash-Away in Reserve Water Discharge while Using Large-Scale Models. Vodnoye Khozyaistvo i Gidrotekhnicheskoye Stroitelstvo. Respublikanskii Mezhvedomstvennyi Sbornik [Water Industry and Hydrotechnical Construction. Republican Interagency Compilation]. Minsk, Vysheishaya Shkola Publ., 15, 68–73 (in Russian).

5. Kanibolotsky A. A. (1980) Dynamics in Wash-Away of Tailings Dam Due to Super-Fluent Water Flows. Osushenie Mestorozhdenii, Rudnichnaya Gidrogeologiya, Spetsial'nye Gornye Raboty, Gidrotekhnika: Temat. Sb. Nauch. Tr. [Drainage of Deposits, Mining Hydrogeology, Special Mining Works, Hydraulic Engineering. Thematic Collection of Scientific Works]. Belgorod, VIOGEM, 93–98 (in Russian).

6. Kherkheulidze I. I., Vinogradova V. I., Rukhadze N. V. (1972) Empirical Dependences used to Calculate Elements for Break of Landslide Dam. Gidrologicheskie i Gidrotekhnicheskie Osnovy Proektirovaniya Protivoselevykh Sooruzhenii: Trudy Zakavkazskogo Nauch.-Issled. Gidrometeor. In-ta [Hydrological and Hydro-Technical Fundamentals for Designing of Mudflow Protection Structures: Proceedings of Transcaucasian Regional Scientific Research Institute]. Leningrad, Lenizdat Publ., 46 (40), 181–206 (in Russian).

7. Kosarev S. G. (2012) Procedure for Analysis of Break-Out Channels Within Bodies of Homogeneous Hydraulic-Fill Dams in Emergency Situations. Power Technology and Engineering, 46 (3), 205–209. https://doi.org/10.1007/s 10749-012-0333-x.

8. Prudovsky A. M. (1998) Passage Formation Due to Break of Earth-Fill Dam. Bezopasnost' Energeticheskikh Sooruzhenii: Nauch.-Tekhn. i Proizvod. Sbornik [Safety of Power Engineering Installations: Scientific-and-Technological and Production Collection]. Moscow, Scientific-Research Institute of Power Engineering Installations, 2–3, 67–79 (in Russian).

9. Ponomarchuk K. R. (2007) Evaluation of Impact of Passage Opening in Soil Dam on Hydraulic Regime of Downstream. Rol' Prirodoobustroistva Sel'skikh Territorii v Obespechenii Ustoichivogo Razvitiya APK: Materialy Mezhdunar. Nauch.Prakt. Konf. Ch. 1 [Role of Environmental Engineering for Agricultural Areas to Provide Sustainable Development for Agroindustrial Complex: Proceedings of Scientific and Practical Conference. Part. 1]. Moscow, Moscow State University of Environmental Engineering, 273.

10. Ponomarchuk K. R. (2011) Evaluation of Parameters for Passage Development while Breaking Soil Dam. Prirodoobustroystvo, (3), 77–82 (in Russian).


Review

For citations:


Bohaslauchyk P.M. Calculation Model of Soil Dam Wash-Away Due to Overflow. Science & Technique. 2018;17(4):292-296. (In Russ.) https://doi.org/10.21122/2227-1031-2018-17-4-292-296

Views: 982


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2227-1031 (Print)
ISSN 2414-0392 (Online)